|
Sufficient
triax has been installed in the building for our cameras.
However, to supplement the building's limited audio and video cables,
we'll probably have to run something like two 12-pair audio mults and
a 10-cable coax mult. Those mults will have to cross this area
between the loading dock and the basketball floor. Since this
is a high-traffic area, they'll have to be flown where possible and
otherwise taped to the floor or protected by mats or cable troughs.
 |